Panacon docs

Mass Production and Pre-Shipment Inspection After Design Confirmation

Applicable Tasks and Prerequisites

After design and deposit confirmation, Panacon arranges mass production, in-process quality control and any required pre-shipment inspection according to the order. Reference source

Steps in Order

  1. Confirm the design and receive/confirm the deposit Reference source
  2. Confirm the applicable mass production lead time according to the order Reference source
  3. Produce according to specifications and perform in-process quality control Reference source
  4. Arrange third-party pre-shipment inspection as required Reference source

Sources